|

TOWN OF STOKESDALE
TAP FEES
|
3/4 Inch Meter -
Residential Tap Fee |
$2,200.00* |
|
3/4 Inch Meter -
Residential (Water Infrastructure by Developer) |
$ 250.00** |
|
1 Inch Meter -
Tap Fee |
$2,900.00* |
|
1 1/2 Inch Meter - Tap Fee |
Cost When Installed |
|
2 Inch Meter -
Tap Fee |
$5,400.00* |
|
3 Inch Meter -
Tap Fee |
$3,500.00 |
|
4 Inch Meter -
Tap Fee |
$4,250.00 |
|
6 Inch Meter -
Tap Fee |
$5,250.00 |
|
|
|
|
* Fees include the yoke, setter and meter for
a residential/business location |
|
|
** Water Extension Maintenance Fee includes meter.
(Yoke & Setter installed by developer in new
subdivision. |
|
|
Plan Review Fee for Extension of Water Lines |
$ 200.00 |
Residents/businesses will be responsible for obtaining permits,
inspections, and installation of lines to connect the meter to the
home/business.
|